Skip to main content
ZYHK logoZYHK Automation

ZYHK Automation: factory automation lines and equipment

Industrial facility with a glowing automation production line concept in front of a glass office building

Factory automation line planning

Automation lines planned around your production floor

ZYHK Automation plans lines and equipment for panel furniture, glass processing, new materials and flooring production.

Glass processing line with robotic arms, a roller conveyor, an edge grinding machine and an RGV transfer cart

Glass processing automation

From edge grinding to transfer, one coordinated line

Intelligent glass double edge grinding machines work with conveyors, RGV transfer and robotic handling in a configured layout.

Panel handling line with overhead robotic loading, flipping arches, roller conveyors and RGV carts

Panel handling and flow

Loading, flipping and RGV transfer in a single flow

Robotic loading and unloading, panel flipping and measurement stations connect through conveyors and lift tables under PLC control.

Equipment portfolio

Build the material flow around your process

Explore all equipment

Production applications

Equipment planned as part of the complete line

Explore all solutions
Glass processing line with robotic handling, conveyor, edge grinding machine and RGV transfer cart

Glass Processing Line

Autonomous edge grinding connected to loading, conveying and transfer equipment.

LoadConveyGrind edges
Panel furniture line with overhead robotic handling, flipping arches, roller conveyors and RGV carts

Panel Furniture Line

Panel infeed, measurement, flipping, transfer and stacking arranged as one flow.

InfeedMeasureFlip
Planned production line concept inside an industrial facility

New Materials and Flooring Line

Conveying, lifting and transfer between production stations for new materials and flooring.

InfeedConveyLevel

Project workflow

Turn production requirements into a coordinated equipment plan

01

Share the production requirement

Provide the material, dimensions, target flow and available floor layout.

02

Plan the material path

Define how material loads, moves, transfers and leaves each process station.

03

Configure the equipment

Match machine size, working height, controls and interfaces to the line.

04

Confirm integration details

Review connection points, site constraints and the information needed for engineering.

Glass processing line with conveying and automated equipment

Prepare your project brief

The details that help start a focused discussion

  • Material type, dimensions and weight range
  • Target production flow and throughput
  • Floor layout, working heights and available space
  • Existing machines and control interfaces to connect
Send your requirements

Engineering approach

From one machine to a coordinated production line

Configured equipment

Machine size, handling method and line interfaces are planned from your material and layout.

PLC visualization

Integrated controls coordinate equipment status, recipes and fault information.

Line integration

Conveyors, RGV transfer, robots and process machines work as one material flow.

Measured requirements

Share material dimensions, throughput and floor constraints for a focused proposal.

Customer supplied process footage

See automation in motion

Real project footage helps buyers discuss handling steps, transfer points and integration needs before detailed engineering begins.

Discuss your line

Planning a new line or upgrading an existing station?

Send the material, dimensions, layout and target flow. The ZYHK Automation team will review the project requirements.

Request a proposal